Showing all 7 results
Classification by country
Services
Sort by price
The most ordered services.
-
Surface well pump in Sri Lanka
R$1222.61
-
Building a mosque in Benin
R$109315.82
-
5-tap artesian well in Uganda
R$13664.48
Active filters
Price filter
تم إضافة “Ablutions with 8 taps in India and Nepal” إلى سلة مشترياتك. عرض السلة
Artesian well pump with faucets and ceramics in India and Nepal
R$6041.14| Type | Artesian |
| Price | 420 BD |
| Estimated Completion Time | 60 |
| Drilling Method | Manual |
| Expected Lifespan | 10-15 |
| Number of Beneficiaries | 100 |
| Depth | 40-50 |
| Notes |
Pump with motor, taps and ceramic tank |
Surface well with hand pump in India and Nepal
R$1078.77
| Type | superficial |
| Price | 75 BD |
| Estimated Completion Time | 15 |
| Drilling Method | Manual |
| Expected Lifespan | 15-12 |
| Number of Beneficiaries | 20-35 |
| Depth | 25-20 |
| Notes | With pump |
Ceramic surface well in India and Nepal
R$1150.69| Type | ceramic surface |
| Price | 80 BD |
| Estimated Completion Time | 20 |
| Drilling Method | Manual |
| Expected Lifespan | 15-20 |
| Number of Beneficiaries | 10-20 |
| Depth | 10-15 |
| Notes | مع مضخه |
Shallow well pump with 2 taps in India and Nepal
R$1869.88| Type | superficial |
| Price | 130 BD |
| Estimated Completion Time | 30 |
| Drilling Method | Manual |
| Expected Lifespan | 10-12 |
| Number of Beneficiaries | 40-60 |
| Depth | 20-15 |
| Notes | مع مضخة مع موتور وحنفيات |
Surface well with 6 taps in India and Nepal
R$2876.73
| Type | superficial |
| Price | 200 BD |
| Estimated Completion Time | 40 |
| Drilling Method | Manual |
| Expected Lifespan | 20-15 |
| Number of Beneficiaries | 60-120 |
| Depth | 40-30 |
| Notes | مع مضخة مع موتور وحنفيات وخزان |
Building a mosque in India or Nepal
R$74795.03مسجد جاهز للصلاة في دولتي الهند أو النيبال
يتكون من : صوتيات – سجاد فاخر – أبواب – شبابيك – مراوح – بئر مياة – خزان مياة – مواضئ – دورات مياة – دينمو مع وصلات كهربائية
أعمدة خرسانية وأرضية صبه أسمنتية
Ablutions with 8 taps in India and Nepal
R$4315.10| Type | مواضئ |
| Price | 300 BD |
| Estimated Completion Time | 50 |
| Drilling Method | Manual |
| Expected Lifespan | 10-15 |
| Number of Beneficiaries | 40-70 |
| Depth | 25- 35 |
| Notes |
مضخة مع موتور وحنفيات وخزان مع مواضئ |
Build Schools And ClassRooms
Building and restoring mosques
Water Supply Projects
Building Houses
Income-generating projects
General Contracting

