Showing all 4 results
Classification by country
Services
Sort by price
The most ordered services.
-
Surface well pump in Sri Lanka
RM954.42
-
Building a mosque in Benin
RM85336.14
-
5-tap artesian well in Uganda
RM10667.02
Active filters
Price filter
Surface well tap in Indonesia
RM2077.26| Type | superficial |
| Price | 185 BD |
| Estimated Completion Time | 60 |
| Drilling Method | ماكينه |
| Expected Lifespan | 10-12 |
| Number of Beneficiaries | 30-80 |
| Depth | 25-20 |
| Notes |
حنفية مع موتور كهربائي |
Surface well with faucets and ceramics in Indonesia
RM5277.37| Type | superficial |
| Price | 470 BD |
| Estimated Completion Time | 75 |
| Drilling Method | ماكينه |
| Expected Lifespan | 10-12 |
| Number of Beneficiaries | 100-150 |
| Depth | 25-20 |
| Notes |
موتور كهربائي مع خزان و حنفيات مع سيراميك |
Building a fully equipped classroom in Indonesia
RM41545.23Providing tables and chairs
Providing mats And paint the walls
Preparing the ground with cement
Building a mosque in Indonesia
RM62879.26Mosque ready for prayer, acoustics, luxury carpets, doors
Windows, fans, shallow well, tank and toilets
With lights and dynamo. Two-story tiled roof.
With concrete columns and ceramic tiles for the interior
The ground and one passed through the wall
Build Schools And ClassRooms
Building and restoring mosques
Water Supply Projects
Building Houses
Income-generating projects
General Contracting

