Surface well pump in Sri Lanka

Rp3687317.71
Type superficial
Price 85 BD
Estimated Completion Time 25
Drilling Method Manual
Expected Lifespan 5-10
Number of Beneficiaries 20-50
Depth 10-15

Surface well pump in Ghana

Rp15183072.94
Type superficial
Price 350 BD
Estimated Completion Time 30
Drilling Method Manual
Expected Lifespan 10-15
Number of Beneficiaries 40-50
Depth 15-20
Notes

مضخة‭ ‬سيراميك

Shallow well pump with 2 taps in India and Nepal

Rp5639427.09
Type superficial
Price 130 BD
Estimated Completion Time 30
Drilling Method Manual
Expected Lifespan 10-12
Number of Beneficiaries 40-60
Depth 20-15
Notes   مع مضخة مع موتور وحنفيات

Surface well pump and ceramics in Bangladesh

Rp5205625.01
Type ceramic surface
Price 120 BD
Estimated Completion Time 25
Drilling Method Manual
Expected Lifespan 10-12
Number of Beneficiaries 25-15
Depth 25-15
Notes   With pump and ceramic

Surface well with 6 taps in India and Nepal

Rp8676041.68

 

Type superficial
Price 200 BD
Estimated Completion Time 40
Drilling Method Manual
Expected Lifespan 20-15
Number of Beneficiaries 60-120
Depth 40-30
Notes   مع مضخة مع موتور وحنفيات وخزان

Surface well with faucets and ceramics in Indonesia

Rp20388697.94
Type superficial
Price 470 BD
Estimated Completion Time 75
Drilling Method ماكينه
Expected Lifespan 10-12
Number of Beneficiaries 100-150
Depth 25-20
Notes

موتور‭ ‬كهربائي‭ ‬مع‭ ‬خزان‭ ‬و‭ ‬حنفيات‭  ‬مع‭ ‬سيراميك

Surface well with ceramics in Pakistan

Rp3470416.67
Type ceramic surface
Price 80 BD
Estimated Completion Time 15
Drilling Method Manual
Expected Lifespan 10-15
Number of Beneficiaries 10-15
Depth 25-15

Building a fully equipped classroom in Indonesia

Rp160506771.04

Providing tables and chairs
Providing mats
And paint the walls
Preparing the ground with cement   

Building a fully equipped classroom in Bangladesh

Rp145323698.11

Building external structures

Preparing the ground with cement

Providing tables and chairs

Providing mats And paint the walls

Building a fully equipped classroom in Tanzania

Rp136647656.43

 Working on building classrooms In needy and poor places
Providing the appropriate environment to encourage students to learn the Arabic language and memorize the Holy Quran by preparing the floor well, covering it with mats, painting the walls, and providing tables and chairs. 

Building a mosque in Indonesia

Rp242929166.98

Mosque ready for prayer, acoustics, luxury carpets, doors
Windows, fans, shallow well, tank and toilets
With lights and dynamo. Two-story tiled roof.
With concrete columns and ceramic tiles for the interior
The ground and one passed through the wall

Building a mosque in India or Nepal

Rp225577083.63

مسجد جاهز للصلاة في دولتي الهند أو النيبال

يتكون من : صوتيات – سجاد فاخر – أبواب – شبابيك – مراوح – بئر مياة – خزان مياة – مواضئ – دورات مياة – دينمو مع وصلات كهربائية

أعمدة خرسانية وأرضية صبه أسمنتية