Showing 25–36 of 49 results
Classification by country
Services
Sort by price
The most ordered services.
-
Surface well pump in Sri Lanka Le5104307.59
-
Building a mosque in Benin Le456385149.23
-
5-tap artesian well in Uganda Le57048143.65
Active filters
Price filter
Surface well pump in Sri Lanka
Le5104307.59Type | superficial |
Price | 85 BD |
Estimated Completion Time | 25 |
Drilling Method | Manual |
Expected Lifespan | 5-10 |
Number of Beneficiaries | 20-50 |
Depth | 10-15 |
Surface well pump in Ghana
Le21017737.14Type | superficial |
Price | 350 BD |
Estimated Completion Time | 30 |
Drilling Method | Manual |
Expected Lifespan | 10-15 |
Number of Beneficiaries | 40-50 |
Depth | 15-20 |
Notes |
مضخة سيراميك |
Shallow well pump with 2 taps in India and Nepal
Le7806588.08Type | superficial |
Price | 130 BD |
Estimated Completion Time | 30 |
Drilling Method | Manual |
Expected Lifespan | 10-12 |
Number of Beneficiaries | 40-60 |
Depth | 20-15 |
Notes | مع مضخة مع موتور وحنفيات |
Surface well pump and ceramics in Bangladesh
Le7206081.30Type | ceramic surface |
Price | 120 BD |
Estimated Completion Time | 25 |
Drilling Method | Manual |
Expected Lifespan | 10-12 |
Number of Beneficiaries | 25-15 |
Depth | 25-15 |
Notes | With pump and ceramic |
Surface well with 6 taps in India and Nepal
Le12010135.51
Type | superficial |
Price | 200 BD |
Estimated Completion Time | 40 |
Drilling Method | Manual |
Expected Lifespan | 20-15 |
Number of Beneficiaries | 60-120 |
Depth | 40-30 |
Notes | مع مضخة مع موتور وحنفيات وخزان |
Surface well with faucets and ceramics in Indonesia
Le28223818.44Type | superficial |
Price | 470 BD |
Estimated Completion Time | 75 |
Drilling Method | ماكينه |
Expected Lifespan | 10-12 |
Number of Beneficiaries | 100-150 |
Depth | 25-20 |
Notes |
موتور كهربائي مع خزان و حنفيات مع سيراميك |
Surface well with ceramics in Pakistan
Le4804054.20Type | ceramic surface |
Price | 80 BD |
Estimated Completion Time | 15 |
Drilling Method | Manual |
Expected Lifespan | 10-15 |
Number of Beneficiaries | 10-15 |
Depth | 25-15 |
Building a fully equipped classroom in Indonesia
Le222187506.86Providing tables and chairs
Providing mats And paint the walls
Preparing the ground with cement
Building a fully equipped classroom in Bangladesh
Le201169769.73Building external structures
Preparing the ground with cement
Providing tables and chairs
Providing mats And paint the walls
Building a fully equipped classroom in Tanzania
Le189159634.22 Working on building classrooms In needy and poor places
Providing the appropriate environment to encourage students to learn the Arabic language and memorize the Holy Quran by preparing the floor well, covering it with mats, painting the walls, and providing tables and chairs.
Building a mosque in Indonesia
Le336283794.17Mosque ready for prayer, acoustics, luxury carpets, doors
Windows, fans, shallow well, tank and toilets
With lights and dynamo. Two-story tiled roof.
With concrete columns and ceramic tiles for the interior
The ground and one passed through the wall
Building a mosque in India or Nepal
Le312263523.16مسجد جاهز للصلاة في دولتي الهند أو النيبال
يتكون من : صوتيات – سجاد فاخر – أبواب – شبابيك – مراوح – بئر مياة – خزان مياة – مواضئ – دورات مياة – دينمو مع وصلات كهربائية
أعمدة خرسانية وأرضية صبه أسمنتية