Surface well tap in Indonesia

R.Q1786.68
Type superficial
Price 185 BD
Estimated Completion Time 60
Drilling Method ماكينه
Expected Lifespan 10-12
Number of Beneficiaries 30-80
Depth 25-20
Notes

حنفية‭ ‬مع‭ ‬موتور‭ ‬كهربائي

Surface well with faucets and ceramics in Indonesia

R.Q4539.13
Type superficial
Price 470 BD
Estimated Completion Time 75
Drilling Method ماكينه
Expected Lifespan 10-12
Number of Beneficiaries 100-150
Depth 25-20
Notes

موتور‭ ‬كهربائي‭ ‬مع‭ ‬خزان‭ ‬و‭ ‬حنفيات‭  ‬مع‭ ‬سيراميك

Building a fully equipped classroom in Indonesia

R.Q35733.60

Providing tables and chairs
Providing mats
And paint the walls
Preparing the ground with cement   

Building a mosque in Indonesia

R.Q54083.29

Mosque ready for prayer, acoustics, luxury carpets, doors
Windows, fans, shallow well, tank and toilets
With lights and dynamo. Two-story tiled roof.
With concrete columns and ceramic tiles for the interior
The ground and one passed through the wall